All the rubble has been removed and taken to a concrete recycling facility to be ground into gravel.
Equipment was sized to existing site logistics to minimize disturbing the mature timber surrounding the pool.
Access to the pool was limited to a steep slope. Everything has been graded, topped with screened top soil, and seeded with blended Fescue. We stabilized the slope with an erosion control blanket to keep the soil and grass seeds from washing away.